<?xml version='1.0' encoding='UTF-8'?><?xml-stylesheet href="http://www.blogger.com/styles/atom.css" type="text/css"?><feed xmlns='http://www.w3.org/2005/Atom' xmlns:openSearch='http://a9.com/-/spec/opensearchrss/1.0/' xmlns:georss='http://www.georss.org/georss' xmlns:gd='http://schemas.google.com/g/2005' xmlns:thr='http://purl.org/syndication/thread/1.0'><id>tag:blogger.com,1999:blog-22934097</id><updated>2012-02-16T10:52:27.389-05:00</updated><category term='Buckhead'/><category term='sidewalks'/><category term='Peachtree'/><category term='streetlamps'/><category term='walkability'/><category term='trees'/><category term='Buckhead CID'/><category term='Boulevard'/><title type='text'>Peachtree Boulevard</title><subtitle type='html'>The Peachtree Boulevard transformation is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway. Wider sidewalks, a tree-lined median, bike lanes – everything a thriving urban community needs.</subtitle><link rel='http://schemas.google.com/g/2005#feed' type='application/atom+xml' href='http://peachtreeboulevard.blogspot.com/feeds/posts/default'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default?max-results=100'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/'/><link rel='hub' href='http://pubsubhubbub.appspot.com/'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/04776549250027067082</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='31' src='http://photos1.blogger.com/blogger/7095/4187/200/windbag2.jpg'/></author><generator version='7.00' uri='http://www.blogger.com'>Blogger</generator><openSearch:totalResults>44</openSearch:totalResults><openSearch:startIndex>1</openSearch:startIndex><openSearch:itemsPerPage>100</openSearch:itemsPerPage><entry><id>tag:blogger.com,1999:blog-22934097.post-3294366815404658249</id><published>2011-11-11T10:02:00.000-05:00</published><updated>2011-11-11T10:02:00.845-05:00</updated><category scheme='http://www.blogger.com/atom/ns#' term='streetlamps'/><category scheme='http://www.blogger.com/atom/ns#' term='walkability'/><title type='text'>Streetlamps Installed, Illuminated Soon</title><content type='html'>&lt;img style="float:right; margin:0 0 10px 10px;cursor:pointer; cursor:hand;width: 250px; height: 250px;" src="http://www.peachtreeboulevard.com/images/111031.bcid.lamp.jpg" alt="" border="0" /&gt;&lt;br /&gt;The first pedestrian lamps in Phase II are now installed and set to be illuminated this week. When the transformation is complete, 188 of these beautiful vintage streetlamps will line Peachtree, lighting your after-hours stroll.&lt;br /&gt;&lt;br /&gt;Also this week, our contractor is installing trees in the landscape buffer, with 24 tree plantings set to be complete by Thanksgiving.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-3294366815404658249?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/3294366815404658249'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/3294366815404658249'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2011/11/streetlamps-installed-illuminated-soon.html' title='Streetlamps Installed, Illuminated Soon'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/01041218378656549060</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='32' src='http://2.bp.blogspot.com/_R4KzJXWYYHI/TDSNWph5RHI/AAAAAAAAAAM/k4TX74T2W10/S220/headshot_LinkedIn.jpg'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-6305430917527659077</id><published>2011-10-18T09:56:00.000-04:00</published><updated>2011-11-02T09:58:01.046-04:00</updated><title type='text'>Granite medians extending to north end of Phase II</title><content type='html'>&lt;!--[if gte mso 9]&gt;&lt;xml&gt;  &lt;w:worddocument&gt;   &lt;w:view&gt;Normal&lt;/w:View&gt;   &lt;w:zoom&gt;0&lt;/w:Zoom&gt;   &lt;w:trackmoves/&gt;   &lt;w:trackformatting/&gt;   &lt;w:punctuationkerning/&gt;   &lt;w:validateagainstschemas/&gt;   &lt;w:saveifxmlinvalid&gt;false&lt;/w:SaveIfXMLInvalid&gt;   &lt;w:ignoremixedcontent&gt;false&lt;/w:IgnoreMixedContent&gt;   &lt;w:alwaysshowplaceholdertext&gt;false&lt;/w:AlwaysShowPlaceholderText&gt;   &lt;w:donotpromoteqf/&gt;   &lt;w:lidthemeother&gt;EN-US&lt;/w:LidThemeOther&gt;   &lt;w:lidthemeasian&gt;X-NONE&lt;/w:LidThemeAsian&gt;   &lt;w:lidthemecomplexscript&gt;X-NONE&lt;/w:LidThemeComplexScript&gt;   &lt;w:compatibility&gt;    &lt;w:breakwrappedtables/&gt;    &lt;w:snaptogridincell/&gt;    &lt;w:wraptextwithpunct/&gt;    &lt;w:useasianbreakrules/&gt;    &lt;w:dontgrowautofit/&gt;    &lt;w:splitpgbreakandparamark/&gt;    &lt;w:dontvertaligncellwithsp/&gt;    &lt;w:dontbreakconstrainedforcedtables/&gt;    &lt;w:dontvertalignintxbx/&gt;    &lt;w:word11kerningpairs/&gt;    &lt;w:cachedcolbalance/&gt;   &lt;/w:Compatibility&gt;   &lt;w:browserlevel&gt;MicrosoftInternetExplorer4&lt;/w:BrowserLevel&gt;   &lt;m:mathpr&gt;    &lt;m:mathfont val="Cambria Math"&gt;    &lt;m:brkbin val="before"&gt;    &lt;m:brkbinsub val="&amp;#45;-"&gt;    &lt;m:smallfrac val="off"&gt;    &lt;m:dispdef/&gt;    &lt;m:lmargin val="0"&gt;    &lt;m:rmargin val="0"&gt;    &lt;m:defjc val="centerGroup"&gt;    &lt;m:wrapindent val="1440"&gt;    &lt;m:intlim val="subSup"&gt;    &lt;m:narylim val="undOvr"&gt;   &lt;/m:mathPr&gt;&lt;/w:WordDocument&gt; &lt;/xml&gt;&lt;![endif]--&gt;&lt;!--[if gte mso 9]&gt;&lt;xml&gt;  &lt;w:latentstyles deflockedstate="false" defunhidewhenused="true" defsemihidden="true" defqformat="false" defpriority="99" latentstylecount="267"&gt;   &lt;w:lsdexception locked="false" priority="0" semihidden="false" unhidewhenused="false" qformat="true" name="Normal"&gt;   &lt;w:lsdexception locked="false" priority="9" semihidden="false" unhidewhenused="false" qformat="true" name="heading 1"&gt;   &lt;w:lsdexception locked="false" priority="9" qformat="true" name="heading 2"&gt;   &lt;w:lsdexception locked="false" priority="9" qformat="true" name="heading 3"&gt;   &lt;w:lsdexception locked="false" priority="9" qformat="true" name="heading 4"&gt;   &lt;w:lsdexception locked="false" priority="9" qformat="true" name="heading 5"&gt;   &lt;w:lsdexception locked="false" priority="9" qformat="true" name="heading 6"&gt;   &lt;w:lsdexception locked="false" priority="9" qformat="true" name="heading 7"&gt;   &lt;w:lsdexception locked="false" priority="9" qformat="true" name="heading 8"&gt;   &lt;w:lsdexception locked="false" priority="9" qformat="true" name="heading 9"&gt;   &lt;w:lsdexception locked="false" priority="39" name="toc 1"&gt;   &lt;w:lsdexception locked="false" priority="39" name="toc 2"&gt;   &lt;w:lsdexception locked="false" priority="39" name="toc 3"&gt;   &lt;w:lsdexception locked="false" priority="39" name="toc 4"&gt;   &lt;w:lsdexception locked="false" priority="39" name="toc 5"&gt;   &lt;w:lsdexception locked="false" priority="39" name="toc 6"&gt;   &lt;w:lsdexception locked="false" priority="39" name="toc 7"&gt;   &lt;w:lsdexception locked="false" priority="39" name="toc 8"&gt;   &lt;w:lsdexception locked="false" priority="39" name="toc 9"&gt;   &lt;w:lsdexception locked="false" priority="35" qformat="true" name="caption"&gt;   &lt;w:lsdexception locked="false" priority="10" semihidden="false" unhidewhenused="false" qformat="true" name="Title"&gt;   &lt;w:lsdexception locked="false" priority="1" name="Default Paragraph Font"&gt;   &lt;w:lsdexception locked="false" priority="11" semihidden="false" unhidewhenused="false" qformat="true" name="Subtitle"&gt;   &lt;w:lsdexception locked="false" priority="22" semihidden="false" unhidewhenused="false" qformat="true" name="Strong"&gt;   &lt;w:lsdexception locked="false" priority="20" semihidden="false" unhidewhenused="false" qformat="true" name="Emphasis"&gt;   &lt;w:lsdexception locked="false" priority="59" semihidden="false" unhidewhenused="false" name="Table Grid"&gt;   &lt;w:lsdexception locked="false" unhidewhenused="false" name="Placeholder Text"&gt;   &lt;w:lsdexception locked="false" priority="1" semihidden="false" unhidewhenused="false" qformat="true" name="No Spacing"&gt;   &lt;w:lsdexception locked="false" priority="60" semihidden="false" unhidewhenused="false" name="Light Shading"&gt;   &lt;w:lsdexception locked="false" priority="61" semihidden="false" unhidewhenused="false" name="Light List"&gt;   &lt;w:lsdexception locked="false" priority="62" semihidden="false" unhidewhenused="false" name="Light Grid"&gt;   &lt;w:lsdexception locked="false" priority="63" semihidden="false" unhidewhenused="false" name="Medium Shading 1"&gt;   &lt;w:lsdexception locked="false" priority="64" semihidden="false" unhidewhenused="false" name="Medium Shading 2"&gt;   &lt;w:lsdexception locked="false" priority="65" semihidden="false" unhidewhenused="false" name="Medium List 1"&gt;   &lt;w:lsdexception locked="false" priority="66" semihidden="false" unhidewhenused="false" name="Medium List 2"&gt;   &lt;w:lsdexception locked="false" priority="67" semihidden="false" unhidewhenused="false" name="Medium Grid 1"&gt;   &lt;w:lsdexception locked="false" priority="68" semihidden="false" unhidewhenused="false" name="Medium Grid 2"&gt;   &lt;w:lsdexception locked="false" priority="69" semihidden="false" unhidewhenused="false" name="Medium Grid 3"&gt;   &lt;w:lsdexception locked="false" priority="70" semihidden="false" unhidewhenused="false" name="Dark List"&gt;   &lt;w:lsdexception locked="false" priority="71" semihidden="false" unhidewhenused="false" name="Colorful Shading"&gt;   &lt;w:lsdexception locked="false" priority="72" semihidden="false" unhidewhenused="false" name="Colorful List"&gt;   &lt;w:lsdexception locked="false" priority="73" semihidden="false" unhidewhenused="false" name="Colorful Grid"&gt;   &lt;w:lsdexception locked="false" priority="60" semihidden="false" unhidewhenused="false" name="Light Shading Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="61" semihidden="false" unhidewhenused="false" name="Light List Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="62" semihidden="false" unhidewhenused="false" name="Light Grid Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="63" semihidden="false" unhidewhenused="false" name="Medium Shading 1 Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="64" semihidden="false" unhidewhenused="false" name="Medium Shading 2 Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="65" semihidden="false" unhidewhenused="false" name="Medium List 1 Accent 1"&gt;   &lt;w:lsdexception locked="false" unhidewhenused="false" name="Revision"&gt;   &lt;w:lsdexception locked="false" priority="34" semihidden="false" unhidewhenused="false" qformat="true" name="List Paragraph"&gt;   &lt;w:lsdexception locked="false" priority="29" semihidden="false" unhidewhenused="false" qformat="true" name="Quote"&gt;   &lt;w:lsdexception locked="false" priority="30" semihidden="false" unhidewhenused="false" qformat="true" name="Intense Quote"&gt;   &lt;w:lsdexception locked="false" priority="66" semihidden="false" unhidewhenused="false" name="Medium List 2 Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="67" semihidden="false" unhidewhenused="false" name="Medium Grid 1 Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="68" semihidden="false" unhidewhenused="false" name="Medium Grid 2 Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="69" semihidden="false" unhidewhenused="false" name="Medium Grid 3 Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="70" semihidden="false" unhidewhenused="false" name="Dark List Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="71" semihidden="false" unhidewhenused="false" name="Colorful Shading Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="72" semihidden="false" unhidewhenused="false" name="Colorful List Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="73" semihidden="false" unhidewhenused="false" name="Colorful Grid Accent 1"&gt;   &lt;w:lsdexception locked="false" priority="60" semihidden="false" unhidewhenused="false" name="Light Shading Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="61" semihidden="false" unhidewhenused="false" name="Light List Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="62" semihidden="false" unhidewhenused="false" name="Light Grid Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="63" semihidden="false" unhidewhenused="false" name="Medium Shading 1 Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="64" semihidden="false" unhidewhenused="false" name="Medium Shading 2 Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="65" semihidden="false" unhidewhenused="false" name="Medium List 1 Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="66" semihidden="false" unhidewhenused="false" name="Medium List 2 Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="67" semihidden="false" unhidewhenused="false" name="Medium Grid 1 Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="68" semihidden="false" unhidewhenused="false" name="Medium Grid 2 Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="69" semihidden="false" unhidewhenused="false" name="Medium Grid 3 Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="70" semihidden="false" unhidewhenused="false" name="Dark List Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="71" semihidden="false" unhidewhenused="false" name="Colorful Shading Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="72" semihidden="false" unhidewhenused="false" name="Colorful List Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="73" semihidden="false" unhidewhenused="false" name="Colorful Grid Accent 2"&gt;   &lt;w:lsdexception locked="false" priority="60" semihidden="false" unhidewhenused="false" name="Light Shading Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="61" semihidden="false" unhidewhenused="false" name="Light List Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="62" semihidden="false" unhidewhenused="false" name="Light Grid Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="63" semihidden="false" unhidewhenused="false" name="Medium Shading 1 Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="64" semihidden="false" unhidewhenused="false" name="Medium Shading 2 Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="65" semihidden="false" unhidewhenused="false" name="Medium List 1 Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="66" semihidden="false" unhidewhenused="false" name="Medium List 2 Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="67" semihidden="false" unhidewhenused="false" name="Medium Grid 1 Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="68" semihidden="false" unhidewhenused="false" name="Medium Grid 2 Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="69" semihidden="false" unhidewhenused="false" name="Medium Grid 3 Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="70" semihidden="false" unhidewhenused="false" name="Dark List Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="71" semihidden="false" unhidewhenused="false" name="Colorful Shading Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="72" semihidden="false" unhidewhenused="false" name="Colorful List Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="73" semihidden="false" unhidewhenused="false" name="Colorful Grid Accent 3"&gt;   &lt;w:lsdexception locked="false" priority="60" semihidden="false" unhidewhenused="false" name="Light Shading Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="61" semihidden="false" unhidewhenused="false" name="Light List Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="62" semihidden="false" unhidewhenused="false" name="Light Grid Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="63" semihidden="false" unhidewhenused="false" name="Medium Shading 1 Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="64" semihidden="false" unhidewhenused="false" name="Medium Shading 2 Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="65" semihidden="false" unhidewhenused="false" name="Medium List 1 Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="66" semihidden="false" unhidewhenused="false" name="Medium List 2 Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="67" semihidden="false" unhidewhenused="false" name="Medium Grid 1 Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="68" semihidden="false" unhidewhenused="false" name="Medium Grid 2 Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="69" semihidden="false" unhidewhenused="false" name="Medium Grid 3 Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="70" semihidden="false" unhidewhenused="false" name="Dark List Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="71" semihidden="false" unhidewhenused="false" name="Colorful Shading Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="72" semihidden="false" unhidewhenused="false" name="Colorful List Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="73" semihidden="false" unhidewhenused="false" name="Colorful Grid Accent 4"&gt;   &lt;w:lsdexception locked="false" priority="60" semihidden="false" unhidewhenused="false" name="Light Shading Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="61" semihidden="false" unhidewhenused="false" name="Light List Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="62" semihidden="false" unhidewhenused="false" name="Light Grid Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="63" semihidden="false" unhidewhenused="false" name="Medium Shading 1 Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="64" semihidden="false" unhidewhenused="false" name="Medium Shading 2 Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="65" semihidden="false" unhidewhenused="false" name="Medium List 1 Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="66" semihidden="false" unhidewhenused="false" name="Medium List 2 Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="67" semihidden="false" unhidewhenused="false" name="Medium Grid 1 Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="68" semihidden="false" unhidewhenused="false" name="Medium Grid 2 Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="69" semihidden="false" unhidewhenused="false" name="Medium Grid 3 Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="70" semihidden="false" unhidewhenused="false" name="Dark List Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="71" semihidden="false" unhidewhenused="false" name="Colorful Shading Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="72" semihidden="false" unhidewhenused="false" name="Colorful List Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="73" semihidden="false" unhidewhenused="false" name="Colorful Grid Accent 5"&gt;   &lt;w:lsdexception locked="false" priority="60" semihidden="false" unhidewhenused="false" name="Light Shading Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="61" semihidden="false" unhidewhenused="false" name="Light List Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="62" semihidden="false" unhidewhenused="false" name="Light Grid Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="63" semihidden="false" unhidewhenused="false" name="Medium Shading 1 Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="64" semihidden="false" unhidewhenused="false" name="Medium Shading 2 Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="65" semihidden="false" unhidewhenused="false" name="Medium List 1 Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="66" semihidden="false" unhidewhenused="false" name="Medium List 2 Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="67" semihidden="false" unhidewhenused="false" name="Medium Grid 1 Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="68" semihidden="false" unhidewhenused="false" name="Medium Grid 2 Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="69" semihidden="false" unhidewhenused="false" name="Medium Grid 3 Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="70" semihidden="false" unhidewhenused="false" name="Dark List Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="71" semihidden="false" unhidewhenused="false" name="Colorful Shading Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="72" semihidden="false" unhidewhenused="false" name="Colorful List Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="73" semihidden="false" unhidewhenused="false" name="Colorful Grid Accent 6"&gt;   &lt;w:lsdexception locked="false" priority="19" semihidden="false" unhidewhenused="false" qformat="true" name="Subtle Emphasis"&gt;   &lt;w:lsdexception locked="false" priority="21" semihidden="false" unhidewhenused="false" qformat="true" name="Intense Emphasis"&gt;   &lt;w:lsdexception locked="false" priority="31" semihidden="false" unhidewhenused="false" qformat="true" name="Subtle Reference"&gt;   &lt;w:lsdexception locked="false" priority="32" semihidden="false" unhidewhenused="false" qformat="true" name="Intense Reference"&gt;   &lt;w:lsdexception locked="false" priority="33" semihidden="false" unhidewhenused="false" qformat="true" name="Book Title"&gt;   &lt;w:lsdexception locked="false" priority="37" name="Bibliography"&gt;   &lt;w:lsdexception locked="false" priority="39" qformat="true" name="TOC Heading"&gt;  &lt;/w:LatentStyles&gt; &lt;/xml&gt;&lt;![endif]--&gt;&lt;!--[if gte mso 10]&gt; &lt;style&gt;  /* Style Definitions */  table.MsoNormalTable  {mso-style-name:"Table Normal";  mso-tstyle-rowband-size:0;  mso-tstyle-colband-size:0;  mso-style-noshow:yes;  mso-style-priority:99;  mso-style-qformat:yes;  mso-style-parent:"";  mso-padding-alt:0in 5.4pt 0in 5.4pt;  mso-para-margin:0in;  mso-para-margin-bottom:.0001pt;  mso-pagination:widow-orphan;  font-size:11.0pt;  font-family:"Calibri","sans-serif";  mso-ascii-font-family:Calibri;  mso-ascii-theme-font:minor-latin;  mso-fareast-font-family:"Times New Roman";  mso-fareast-theme-font:minor-fareast;  mso-hansi-font-family:Calibri;  mso-hansi-theme-font:minor-latin;  mso-bidi-font-family:"Times New Roman";  mso-bidi-theme-font:minor-bidi;} &lt;/style&gt; &lt;![endif]--&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="color:#1F497D"&gt;The installation of the new granite medians is now moving to between Peachtree Dunwoody and Wieuca Road. These medians will improve traffic flow, and their landscaping will beautify your view. Contractors are pouring remedial sidewalk at Phipps Plaza and starting storm water work around Lenox Road.&lt;/span&gt;&lt;/p&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-6305430917527659077?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/6305430917527659077'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/6305430917527659077'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2011/10/granite-medians-extending-to-north-end.html' title='Granite medians extending to north end of Phase II'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/01041218378656549060</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='32' src='http://2.bp.blogspot.com/_R4KzJXWYYHI/TDSNWph5RHI/AAAAAAAAAAM/k4TX74T2W10/S220/headshot_LinkedIn.jpg'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-8070181809784332235</id><published>2011-09-20T10:41:00.000-04:00</published><updated>2011-09-27T10:43:42.089-04:00</updated><title type='text'>Granite medians going in, soon to hold beautiful landscaping</title><content type='html'>&lt;div class="separator" style="clear: both; text-align: right;"&gt;&lt;a href="http://3.bp.blogspot.com/-0pjvEL7tffA/ToHg2WBP8UI/AAAAAAAADWg/ngSGyOtTB3Y/s1600/bcid_blvd_median_cropped.jpg" imageanchor="1" style="clear: right; float: right; margin-bottom: 1em; margin-left: 1em;"&gt;&lt;img border="0" height="217" src="http://3.bp.blogspot.com/-0pjvEL7tffA/ToHg2WBP8UI/AAAAAAAADWg/ngSGyOtTB3Y/s320/bcid_blvd_median_cropped.jpg" width="320" /&gt;&lt;/a&gt;&lt;/div&gt;Granite medians are now going in between Stratford Drive and Lenox Parkway. These medians will be landscaped with lush greenery, beautifying the boulevard while easing your drive by limiting the number of left turns.&lt;br /&gt;&lt;br /&gt;You will also see mast arm poles being installed throughout the Phase II region. This will reduce unsightly utility lines, improving the view of offices, hotels, and storefronts along the sidewalk.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-8070181809784332235?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/8070181809784332235'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/8070181809784332235'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2011/09/granite-medians-going-in-soon-to-hold.html' title='Granite medians going in, soon to hold beautiful landscaping'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/04776549250027067082</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='31' src='http://photos1.blogger.com/blogger/7095/4187/200/windbag2.jpg'/></author><media:thumbnail xmlns:media='http://search.yahoo.com/mrss/' url='http://3.bp.blogspot.com/-0pjvEL7tffA/ToHg2WBP8UI/AAAAAAAADWg/ngSGyOtTB3Y/s72-c/bcid_blvd_median_cropped.jpg' height='72' width='72'/></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-590519495855212921</id><published>2011-08-23T10:43:00.000-04:00</published><updated>2011-09-27T10:45:50.700-04:00</updated><title type='text'>North side of Peachtree now walkable throughout Phase II</title><content type='html'>&lt;div class="separator" style="clear: both; text-align: center;"&gt;&lt;a href="http://2.bp.blogspot.com/-BLNDoGGJ4kY/ToHhVHU-qeI/AAAAAAAADWk/6ecfN8Yho5M/s1600/110616.bcid.boulevard.blog.jpg" imageanchor="1" style="clear: right; float: right; margin-bottom: 1em; margin-left: 1em;"&gt;&lt;img border="0" height="240" src="http://2.bp.blogspot.com/-BLNDoGGJ4kY/ToHhVHU-qeI/AAAAAAAADWk/6ecfN8Yho5M/s320/110616.bcid.boulevard.blog.jpg" width="320" /&gt;&lt;/a&gt;&lt;/div&gt;You may now enjoy an unimpeded walk along the north side of the Peachtree Boulevard Phase II thanks to the completion of the new and wider sidewalk. The new blacktop in the southbound lanes is providing a smooth ride along the expanded curb line.&lt;br /&gt;&lt;br /&gt;We will soon turn our attention to starting the landscaped median that will add beauty and consistent flow through all of Phase II.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-590519495855212921?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/590519495855212921'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/590519495855212921'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2011/08/north-side-of-peachtree-now-walkable.html' title='North side of Peachtree now walkable throughout Phase II'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/04776549250027067082</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='31' src='http://photos1.blogger.com/blogger/7095/4187/200/windbag2.jpg'/></author><media:thumbnail xmlns:media='http://search.yahoo.com/mrss/' url='http://2.bp.blogspot.com/-BLNDoGGJ4kY/ToHhVHU-qeI/AAAAAAAADWk/6ecfN8Yho5M/s72-c/110616.bcid.boulevard.blog.jpg' height='72' width='72'/></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-5238069104280517082</id><published>2011-07-18T10:53:00.001-04:00</published><updated>2011-07-20T10:55:25.186-04:00</updated><title type='text'>Paving, Wall Show Signs of Progress</title><content type='html'>With large parts of the sidewalk in place, our contractor is paving the southbound lanes, making for a smooth ride past Phipps Plaza and Lenox Square Mall. The wall going up south of Lenox Square Mall’s main entrance gives a hint as to how far back the tree-lined sidewalk will be when the transformation is complete. Strolling through the busiest part of Buckhead will become an even more pleasant experience.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-5238069104280517082?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/5238069104280517082'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/5238069104280517082'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2011/07/paving-wall-show-signs-of-progress.html' title='Paving, Wall Show Signs of Progress'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/01041218378656549060</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='32' src='http://2.bp.blogspot.com/_R4KzJXWYYHI/TDSNWph5RHI/AAAAAAAAAAM/k4TX74T2W10/S220/headshot_LinkedIn.jpg'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-2356672034215096922</id><published>2011-06-21T14:18:00.000-04:00</published><updated>2011-06-22T14:21:55.240-04:00</updated><category scheme='http://www.blogger.com/atom/ns#' term='sidewalks'/><title type='text'>Sidewalk Almost Finished in Front of Maggiano's</title><content type='html'>&lt;div class="separator" style="clear: both; text-align: center;"&gt;&lt;a href="http://4.bp.blogspot.com/-wmi5x-a_9Mw/TgIyqTIqiuI/AAAAAAAACow/0UWNHtbSFUk/s1600/110616.bcid.boulevard.blog.jpg" imageanchor="1" style="clear: right; float: right; margin-bottom: 1em; margin-left: 1em;"&gt;&lt;img border="0" height="150" src="http://4.bp.blogspot.com/-wmi5x-a_9Mw/TgIyqTIqiuI/AAAAAAAACow/0UWNHtbSFUk/s200/110616.bcid.boulevard.blog.jpg" width="200" /&gt;&lt;/a&gt;&lt;/div&gt;&lt;b&gt;&lt;span style="font-family: &amp;quot;Verdana&amp;quot;,&amp;quot;sans-serif&amp;quot;; font-size: 10.0pt; mso-ansi-language: EN-US; mso-bidi-font-family: &amp;quot;Times New Roman&amp;quot;; mso-bidi-language: AR-SA; mso-fareast-font-family: Calibri; mso-fareast-language: EN-US; mso-fareast-theme-font: minor-latin;"&gt;Peachtree Transformation&amp;nbsp; - &lt;/span&gt;&lt;/b&gt;&lt;span style="font-family: &amp;quot;Verdana&amp;quot;,&amp;quot;sans-serif&amp;quot;; font-size: 10.0pt; mso-ansi-language: EN-US; mso-bidi-font-family: &amp;quot;Times New Roman&amp;quot;; mso-bidi-language: AR-SA; mso-fareast-font-family: Calibri; mso-fareast-language: EN-US; mso-fareast-theme-font: minor-latin;"&gt;The walk to Maggiano's is about to become more pleasant. The &lt;a href="http://cl.exct.net/?ju=fe28177577610779701779&amp;amp;ls=fdec10787164067b7112787c&amp;amp;m=fefe107171640c&amp;amp;l=febc16777d61037b&amp;amp;s=fdfd157273600d7d75177272&amp;amp;jb=ffcf14&amp;amp;t=" title="11-foot-wide sidewalk"&gt;11-foot-wide sidewalk &lt;/a&gt;along that stretch of Peachtree is very close to completion. Our contractor also intends to widen Peachtree Road along the north side in time for the Peachtree Road Race on the Fourth of July.&lt;/span&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-2356672034215096922?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/2356672034215096922'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/2356672034215096922'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2011/06/sidewalk-almost-finished-in-front-of.html' title='Sidewalk Almost Finished in Front of Maggiano&apos;s'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/04776549250027067082</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='31' src='http://photos1.blogger.com/blogger/7095/4187/200/windbag2.jpg'/></author><media:thumbnail xmlns:media='http://search.yahoo.com/mrss/' url='http://4.bp.blogspot.com/-wmi5x-a_9Mw/TgIyqTIqiuI/AAAAAAAACow/0UWNHtbSFUk/s72-c/110616.bcid.boulevard.blog.jpg' height='72' width='72'/></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-189453456020117775</id><published>2011-05-21T10:34:00.003-04:00</published><updated>2011-06-01T10:38:37.387-04:00</updated><title type='text'>Sidewalk on North Side of Peachtree Almost Complete</title><content type='html'>&lt;div class="separator" style="clear: both; text-align: center;"&gt;&lt;/div&gt;&lt;div class="separator" style="clear: both; text-align: center;"&gt;&lt;a href="http://4.bp.blogspot.com/-xrUnPH8bnek/TeZO4P3eJvI/AAAAAAAACiA/Jqr_n6tijrY/s1600/bcid_ptreeboulevard_walkabl.jpg" imageanchor="1" style="clear: right; float: right; margin-bottom: 1em; margin-left: 1em;"&gt;&lt;img border="0" height="133" src="http://4.bp.blogspot.com/-xrUnPH8bnek/TeZO4P3eJvI/AAAAAAAACiA/Jqr_n6tijrY/s200/bcid_ptreeboulevard_walkabl.jpg" width="200" /&gt;&lt;/a&gt;&lt;/div&gt;The 11-foot-wide sidewalk along the north side of Peachtree is almost complete. Lined with willow oak trees and a landscaped buffer, the sidewalk will provide a pleasant walk from beyond Phipps Plaza south past Piedmont. New asphalt for the widened southbound lanes is set to be laid in two weeks.&lt;br /&gt;The Peachtree Boulevard transformation is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. &lt;a href="http://www.peachtreeboulevard.com/"&gt;www.peachtreeboulevard.com&lt;/a&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-189453456020117775?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/189453456020117775'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/189453456020117775'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2011/05/sidewalk-on-north-side-of-peachtree.html' title='Sidewalk on North Side of Peachtree Almost Complete'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/04776549250027067082</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='31' src='http://photos1.blogger.com/blogger/7095/4187/200/windbag2.jpg'/></author><media:thumbnail xmlns:media='http://search.yahoo.com/mrss/' url='http://4.bp.blogspot.com/-xrUnPH8bnek/TeZO4P3eJvI/AAAAAAAACiA/Jqr_n6tijrY/s72-c/bcid_ptreeboulevard_walkabl.jpg' height='72' width='72'/></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-2754343094783907231</id><published>2011-04-19T10:32:00.000-04:00</published><updated>2011-04-19T10:32:32.568-04:00</updated><title type='text'>Sidewalk Now Lining Phipps Plaza on North Side of Peachtree</title><content type='html'>&lt;div class="separator" style="clear: both; text-align: center;"&gt;&lt;/div&gt;&lt;div class="separator" style="clear: both; text-align: center;"&gt;&lt;a href="http://3.bp.blogspot.com/-p7kLTPdTI0o/Ta2cieDgobI/AAAAAAAACf4/vy_iUJn3H74/s1600/BCID_PBlvd_sidewalk.jpg" imageanchor="1" style="clear: right; float: right; margin-bottom: 1em; margin-left: 1em;"&gt;&lt;img border="0" height="200" src="http://3.bp.blogspot.com/-p7kLTPdTI0o/Ta2cieDgobI/AAAAAAAACf4/vy_iUJn3H74/s200/BCID_PBlvd_sidewalk.jpg" width="200" /&gt;&lt;/a&gt;&lt;/div&gt;Imagine a pleasant, shaded walk from Phipps Plaza, past Lenox Square Mall, to catch the train at the Buckhead MARTA station. It is in the not-too-distant future. Installation of the new, wider sidewalk in front of Phipps is almost complete. It will be set back from the road by a landscaped buffer and lined with shade trees. Granite curbing now lines almost the entire north side of Phase II of the Peachtree Boulevard transformation.&lt;br /&gt;&lt;br /&gt;Fiber optic cables and other utilities are also going in, mainly at night to minimize disruptions.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-2754343094783907231?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/2754343094783907231'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/2754343094783907231'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2011/04/sidewalk-now-lining-phipps-plaza-on.html' title='Sidewalk Now Lining Phipps Plaza on North Side of Peachtree'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/04776549250027067082</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='31' src='http://photos1.blogger.com/blogger/7095/4187/200/windbag2.jpg'/></author><media:thumbnail xmlns:media='http://search.yahoo.com/mrss/' url='http://3.bp.blogspot.com/-p7kLTPdTI0o/Ta2cieDgobI/AAAAAAAACf4/vy_iUJn3H74/s72-c/BCID_PBlvd_sidewalk.jpg' height='72' width='72'/></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-3303345087418550183</id><published>2011-02-11T10:13:00.009-05:00</published><updated>2011-04-19T10:16:19.066-04:00</updated><title type='text'>Granite curb going in, followed by new, wider sidewalk</title><content type='html'>&lt;div class="separator" style="clear: both; text-align: center;"&gt;&lt;a href="http://3.bp.blogspot.com/_R4KzJXWYYHI/TQkq_YSKNbI/AAAAAAAAACA/erlvMjZ0iGo/s1600/HPIM4080.JPG" imageanchor="1" style="clear: right; float: right; margin-bottom: 1em; margin-left: 1em;"&gt;&lt;img border="0" height="239" src="http://3.bp.blogspot.com/_R4KzJXWYYHI/TQkq_YSKNbI/AAAAAAAAACA/erlvMjZ0iGo/s320/HPIM4080.JPG" width="320" /&gt;&lt;/a&gt;&lt;/div&gt;&lt;span class="apple-style-span"&gt;&lt;span style="color: #333333; font-family: Verdana, sans-serif; font-size: 11pt;"&gt;Following the holiday break and a week of snow, progress on the Peachtree Boulevard transformation is back at full speed. Crews are installing the granite curbs you may have noticed stacked just north of Maggiano's.&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;br /&gt;&lt;span class="apple-style-span"&gt;&lt;span style="color: #333333; font-family: Verdana, sans-serif; font-size: 11pt;"&gt;&lt;br /&gt;&lt;/span&gt;&lt;/span&gt;&lt;br /&gt;&lt;span class="apple-style-span"&gt;&lt;span style="color: #333333; font-family: Verdana, sans-serif; font-size: 11pt;"&gt;Before installation, these curbs are more than 15 inches tall (the former Buckhead CID ED called them the "Cliffs of Dover")! Once installed below grade, however, only six inches will be exposed, forming an attractive and sturdy transition from the road to the sidewalk buffer.&lt;/span&gt;&lt;/span&gt;&lt;span style="color: #333333; font-family: Verdana, sans-serif; font-size: 11pt;"&gt;&lt;span class="apple-style-span"&gt;&lt;/span&gt;&lt;/span&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-3303345087418550183?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/3303345087418550183'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/3303345087418550183'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2011/02/granite-curb-going-in-followed-by-new.html' title='Granite curb going in, followed by new, wider sidewalk'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/04776549250027067082</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='31' src='http://photos1.blogger.com/blogger/7095/4187/200/windbag2.jpg'/></author><media:thumbnail xmlns:media='http://search.yahoo.com/mrss/' url='http://3.bp.blogspot.com/_R4KzJXWYYHI/TQkq_YSKNbI/AAAAAAAAACA/erlvMjZ0iGo/s72-c/HPIM4080.JPG' height='72' width='72'/></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-8806113601272265333</id><published>2010-10-22T09:47:00.001-04:00</published><updated>2010-10-25T09:54:38.978-04:00</updated><category scheme='http://www.blogger.com/atom/ns#' term='sidewalks'/><title type='text'>Granite curb going in, followed by new, wider sidewalk</title><content type='html'>&lt;div&gt;We're seeing a flurry of activity along Peachtree to ensure excellent progress before we scale back for the holidays. Several retaining walls are now complete, so we turn our attention to installing granite curbing on the north side of Peachtree at Stratford Road. When that is complete in the next two weeks, we will pour the new, wider sidewalk.&lt;/div&gt;&lt;br /&gt;&lt;div&gt;The Peachtree Boulevard transformation is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway. Information is available at: &lt;a href="http://www.peachtreeboulevard.com/"&gt;http://www.peachtreeboulevard.com&lt;/a&gt;.&lt;/div&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-8806113601272265333?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/8806113601272265333'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/8806113601272265333'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2010/10/granite-curb-going-in-followed-by-new.html' title='Granite curb going in, followed by new, wider sidewalk'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/01041218378656549060</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='32' src='http://2.bp.blogspot.com/_R4KzJXWYYHI/TDSNWph5RHI/AAAAAAAAAAM/k4TX74T2W10/S220/headshot_LinkedIn.jpg'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-3027531978147008216</id><published>2010-09-14T20:06:00.005-04:00</published><updated>2010-09-15T11:24:19.351-04:00</updated><title type='text'>Widening of Peachtree's north side taking shape</title><content type='html'>&lt;a onblur="try {parent.deselectBloggerImageGracefully();} catch(e) {}" href="http://2.bp.blogspot.com/_R4KzJXWYYHI/TJDkcxN8aPI/AAAAAAAAABE/Bo60tqVFtpA/s1600/bcid_retainingwall.jpg"&gt;&lt;img style="margin: 0pt 0pt 10px 10px; float: right; cursor: pointer; width: 151px; height: 200px;" src="http://2.bp.blogspot.com/_R4KzJXWYYHI/TJDkcxN8aPI/AAAAAAAAABE/Bo60tqVFtpA/s200/bcid_retainingwall.jpg" alt="" id="BLOGGER_PHOTO_ID_5517160726428150002" border="0" /&gt;&lt;/a&gt;Phase II of the Peachtree Boulevard transformation is making visible progress. Aside from the moving of utilities and installation of storm drains, new retaining walls are going up, and the widening of Peachtree’s north side is beginning to take shape. One of the results will be the straightening of the Stratford Road “shift” that has confused southbound drivers for years.&lt;div class="MsoNormal"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div class="MsoNormal"&gt;The Peachtree Boulevard transformation is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway. Information is available at: &lt;a href="http://www.peachtreeboulevard.com/"&gt;http://www.peachtreeboulevard.com&lt;/a&gt;.&lt;/div&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-3027531978147008216?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/3027531978147008216'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/3027531978147008216'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2010/09/widening-of-peachtrees-north-side.html' title='Widening of Peachtree&apos;s north side taking shape'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/04776549250027067082</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='31' src='http://photos1.blogger.com/blogger/7095/4187/200/windbag2.jpg'/></author><media:thumbnail xmlns:media='http://search.yahoo.com/mrss/' url='http://2.bp.blogspot.com/_R4KzJXWYYHI/TJDkcxN8aPI/AAAAAAAAABE/Bo60tqVFtpA/s72-c/bcid_retainingwall.jpg' height='72' width='72'/></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-5485696104413224003</id><published>2010-07-17T10:28:00.003-04:00</published><updated>2010-07-17T10:44:44.418-04:00</updated><category scheme='http://www.blogger.com/atom/ns#' term='trees'/><category scheme='http://www.blogger.com/atom/ns#' term='Boulevard'/><category scheme='http://www.blogger.com/atom/ns#' term='Peachtree'/><title type='text'>Peachtree Boulevard transformation Phase II underway</title><content type='html'>&lt;a onblur="try {parent.deselectBloggerImageGracefully();} catch(e) {}" href="http://3.bp.blogspot.com/_R4KzJXWYYHI/TEHBNxt8fTI/AAAAAAAAAAw/7zSGyZ3kusw/s1600/buckhead-street-scenes-may-.jpg"&gt;&lt;img style="margin: 0pt 0pt 10px 10px; float: right; cursor: pointer; width: 165px; height: 200px;" src="http://3.bp.blogspot.com/_R4KzJXWYYHI/TEHBNxt8fTI/AAAAAAAAAAw/7zSGyZ3kusw/s200/buckhead-street-scenes-may-.jpg" alt="" id="BLOGGER_PHOTO_ID_5494885462797221170" border="0" /&gt;&lt;/a&gt;Another stretch of Atlanta’s signature street is about to undergo a stunning transformation. Phase II of the Peachtree Boulevard transformation has begun, extending from the Buckhead MARTA station north past Phipps Plaza. After several weeks of utility work, crews have begun removing trees along the route, all to be replaced with 85 quality oak shade trees. Those trees will grow about one foot per year, up to 35 feet.&lt;br /&gt;&lt;br /&gt;A look at Phase I (from the other side of Piedmont Road to the MARTA overpass) shows how quickly the new trees we are adding will grow to provide a lush, shaded vista along Peachtree in Buckhead.&lt;br /&gt;&lt;br /&gt;The Peachtree Boulevard transformation is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway. Information is available at: &lt;a href="http://www.peachtreeboulevard.com/"&gt;http://www.peachtreeboulevard.com&lt;/a&gt;.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-5485696104413224003?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/5485696104413224003'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/5485696104413224003'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2010/07/peachtree-boulevard-transformation.html' title='Peachtree Boulevard transformation Phase II underway'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/01041218378656549060</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='32' src='http://2.bp.blogspot.com/_R4KzJXWYYHI/TDSNWph5RHI/AAAAAAAAAAM/k4TX74T2W10/S220/headshot_LinkedIn.jpg'/></author><media:thumbnail xmlns:media='http://search.yahoo.com/mrss/' url='http://3.bp.blogspot.com/_R4KzJXWYYHI/TEHBNxt8fTI/AAAAAAAAAAw/7zSGyZ3kusw/s72-c/buckhead-street-scenes-may-.jpg' height='72' width='72'/></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-7052608695847593930</id><published>2010-01-15T15:29:00.000-05:00</published><updated>2011-02-11T10:08:03.357-05:00</updated><title type='text'>Back to work following the extended winter break</title><content type='html'>&lt;a href="http://3.bp.blogspot.com/_R4KzJXWYYHI/TQkq_YSKNbI/AAAAAAAAACA/erlvMjZ0iGo/s1600/HPIM4080.JPG" onblur="try {parent.deselectBloggerImageGracefully();} catch(e) {}"&gt;&lt;img alt="" border="0" id="BLOGGER_PHOTO_ID_5551015284049589682" src="http://3.bp.blogspot.com/_R4KzJXWYYHI/TQkq_YSKNbI/AAAAAAAAACA/erlvMjZ0iGo/s200/HPIM4080.JPG" style="cursor: pointer; float: right; height: 150px; margin: 0pt 0pt 10px 10px; width: 200px;" /&gt;&lt;/a&gt;After a holiday lane closure moratorium and a week of snow, the Peachtree Boulevard transformation is forging ahead. Crews are installing the granite curbs you may have noticed stacked just north of Maggiano's. Before installation, these curbs are more than 15 inches tall (the former Buckhead CID ED called them the "Cliffs of Dover")! Once installed below grade, however, only six inches will be exposed, forming an attractive and sturdy transition from the road to the sidewalk buffer.&lt;br /&gt;&lt;br /&gt;&lt;span style="font-style: italic;"&gt;The Peachtree Boulevard transformation is the major enhancement of a  stretch of Peachtree Road in Buckhead into a more livable, walkable,  bikable and drivable promenade. The transformation will allow Peachtree  to live up to its reputation as Atlanta’s “signature street.” It will  become a destination, not just a throughway. Information is available  at: &lt;/span&gt;&lt;a href="http://www.peachtreeboulevard.com/" style="font-style: italic;"&gt;http://www.peachtreeboulevard.com&lt;/a&gt;&lt;span style="font-style: italic;"&gt;.&lt;/span&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-7052608695847593930?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/7052608695847593930'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/7052608695847593930'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2010/12/back-to-work-following-extended-winter.html' title='Back to work following the extended winter break'/><author><name>Brennan Robison</name><uri>http://www.blogger.com/profile/01041218378656549060</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='32' height='32' src='http://2.bp.blogspot.com/_R4KzJXWYYHI/TDSNWph5RHI/AAAAAAAAAAM/k4TX74T2W10/S220/headshot_LinkedIn.jpg'/></author><media:thumbnail xmlns:media='http://search.yahoo.com/mrss/' url='http://3.bp.blogspot.com/_R4KzJXWYYHI/TQkq_YSKNbI/AAAAAAAAACA/erlvMjZ0iGo/s72-c/HPIM4080.JPG' height='72' width='72'/></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-6786319378909175763</id><published>2007-10-16T16:32:00.000-04:00</published><updated>2007-10-17T14:36:25.439-04:00</updated><title type='text'>Mayor Franklin cuts ribbon on Peachtree Boulevard Phase I</title><content type='html'>&lt;a href="http://bp1.blogger.com/_Dp_VnR1LtuQ/RxZWHEut3HI/AAAAAAAAABs/YJxx050grY0/s1600-h/bcid_ribboncutting.JPG"&gt;&lt;img id="BLOGGER_PHOTO_ID_5122376305709276274" style="FLOAT: right; MARGIN: 0px 0px 10px 10px; CURSOR: hand" alt="" src="http://bp1.blogger.com/_Dp_VnR1LtuQ/RxZWHEut3HI/AAAAAAAAABs/YJxx050grY0/s400/bcid_ribboncutting.JPG" border="0" /&gt;&lt;/a&gt;&lt;br /&gt;&lt;div&gt;The Peachtree Boulevard Transformation from Maple Drive to the Buckhead MARTA station is complete! Today, Atlanta Mayor Shirley Franklin joined community and business leaders to cut the ribbon on phase I of the transformation.&lt;/div&gt;&lt;br /&gt;&lt;div&gt;&lt;br /&gt;*** Photos from today’s ribbon cutting: &lt;a href="http://www.peachtreeboulevard.com/"&gt;http://www.peachtreeboulevard.com/&lt;/a&gt; ***&lt;/div&gt;&lt;br /&gt;&lt;div&gt;&lt;br /&gt;“I know that Buckhead is setting the standard,” Franklin said. “Buckhead is a part of our community that prides itself on setting very high standards for livability for quality of life, and I know this project is going to set a new high standard for Atlanta.”&lt;br /&gt;&lt;br /&gt;Walking along this stretch of Peachtree in Buckhead now means wider sidewalks protected by landscaped buffers and shaded by dozens of willow oaks. Planted medians ease the way across the new crosswalks with time-displayed signals. Better lighting improves the view at night. The choice to walk in Buckhead just got easier.&lt;br /&gt;&lt;br /&gt;The Peachtree Boulevard Transformation is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation allows Peachtree to live up to its reputation as Atlanta’s “signature street,” making it a destination, not just a throughway.&lt;br /&gt;&lt;br /&gt;“We want to get people out of cars by giving them an inviting place to walk,” said Buckhead neighborhood activist Sally Silver, who was instrumental in the conception of the transformation, which began in the mid ‘90s. “Put some trees and benches and some street lamps between you and that car coming down the highway, and it increases your comfort level. It makes people feel more welcome to be out there.”&lt;br /&gt;&lt;br /&gt;Phase I is only the beginning. Phase II is longer and extends from the MARTA bridge to Roxboro Road north of Phipps Plaza. The Buckhead CID is working with GDOT to acquire right-of-way through purchase and donation. Pending the release of state funds, development of Phase II is set to begin in 2008.&lt;/div&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-6786319378909175763?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/6786319378909175763'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/6786319378909175763'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/10/mayor-franklin-cuts-ribbon-on-peachtree.html' title='Mayor Franklin cuts ribbon on Peachtree Boulevard Phase I'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author><media:thumbnail xmlns:media='http://search.yahoo.com/mrss/' url='http://bp1.blogger.com/_Dp_VnR1LtuQ/RxZWHEut3HI/AAAAAAAAABs/YJxx050grY0/s72-c/bcid_ribboncutting.JPG' height='72' width='72'/></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-3127506929290596972</id><published>2007-09-20T08:36:00.000-04:00</published><updated>2007-10-04T08:49:43.053-04:00</updated><category scheme='http://www.blogger.com/atom/ns#' term='Buckhead'/><category scheme='http://www.blogger.com/atom/ns#' term='Boulevard'/><category scheme='http://www.blogger.com/atom/ns#' term='Peachtree'/><category scheme='http://www.blogger.com/atom/ns#' term='Buckhead CID'/><title type='text'>Ribbon cutting for Phase I Tuesday, October 16, 3 p.m.</title><content type='html'>&lt;a href="http://bp2.blogger.com/_Dp_VnR1LtuQ/RwTgV6fZXhI/AAAAAAAAABk/cDwyTBtnFkg/s1600-h/walkable_thumb.JPG"&gt;&lt;img id="BLOGGER_PHOTO_ID_5117461743682543122" style="FLOAT: right; MARGIN: 0px 0px 10px 10px; CURSOR: hand" alt="" src="http://bp2.blogger.com/_Dp_VnR1LtuQ/RwTgV6fZXhI/AAAAAAAAABk/cDwyTBtnFkg/s400/walkable_thumb.JPG" border="1" /&gt;&lt;/a&gt;&lt;br /&gt;&lt;div&gt;Phase I is done.&lt;br /&gt;&lt;br /&gt;Join Atlanta Mayor Shirley Franklin and the Buckhead community at the Intercontinental Hotel's new streetfront patio for an event to celebrate Buckhead's new walkable, bikable thoroughfare. Come see the prototype of tomorrow's Peachtree and hear about plans for Phase II of the Peachtree Boulevard transformation.&lt;/div&gt;&lt;div&gt;&lt;blockquote&gt;&lt;blockquote&gt;&lt;/blockquote&gt;&lt;a href="http://www.alisias.com/templates/invitation4_gfx.cfm?eventid=115&amp;amp;id=0"&gt;View the invitation.&lt;/a&gt; &lt;p&gt;Peachtree Boulevard - Phase I Ribbon Cutting Tuesday, October 16, 2007 3 p.m.&lt;br /&gt;Intercontinental Hotel - Buckhead&lt;br /&gt;3315 Peachtree Rd NE&lt;/p&gt;&lt;/blockquote&gt;&lt;/div&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-3127506929290596972?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/3127506929290596972'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/3127506929290596972'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/09/ribbon-cutting-for-phase-i-tuesday.html' title='Ribbon cutting for Phase I Tuesday, October 16, 3 p.m.'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author><media:thumbnail xmlns:media='http://search.yahoo.com/mrss/' url='http://bp2.blogger.com/_Dp_VnR1LtuQ/RwTgV6fZXhI/AAAAAAAAABk/cDwyTBtnFkg/s72-c/walkable_thumb.JPG' height='72' width='72'/></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-6530272512823900733</id><published>2007-08-27T13:38:00.000-04:00</published><updated>2007-08-29T14:05:07.645-04:00</updated><title type='text'>Median taking shape quickly</title><content type='html'>The centerpiece of the Peachtree Boulevard transformation is taking shape at a quick pace. Crews are working day and night to install segments past Piedmont down to Maple Drive. The medians will be landscaped and lined with trees, improving safety for pedestrians and drivers.&lt;br /&gt;&lt;br /&gt;Crews are also sandblasting and sealing sidewalks through out project. Tree installation will resume in October.&lt;br /&gt;&lt;br /&gt;The &lt;a href="http://www.peachtreeboulevard.com/"&gt;Peachtree Boulevard transformation &lt;/a&gt;is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway. Information is available at: &lt;a href="http://www.peachtreeboulevard.com/"&gt;http://www.peachtreeboulevard.com/&lt;/a&gt;.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-6530272512823900733?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/6530272512823900733'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/6530272512823900733'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/08/median-taking-shape-quickly.html' title='Median taking shape quickly'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-5842379060444459565</id><published>2007-06-29T13:19:00.000-04:00</published><updated>2007-08-29T13:29:59.310-04:00</updated><title type='text'>Rendering becoming reality</title><content type='html'>&lt;a href="http://bp3.blogger.com/_Dp_VnR1LtuQ/RtWs4x5hSOI/AAAAAAAAABc/NgbmZSKDeaA/s1600-h/Buckhead-CID+Map_0001.jpg"&gt;&lt;img id="BLOGGER_PHOTO_ID_5104175844161571042" style="FLOAT: right; MARGIN: 0px 0px 10px 10px; CURSOR: hand" height="145" alt="" src="http://bp3.blogger.com/_Dp_VnR1LtuQ/RtWs4x5hSOI/AAAAAAAAABc/NgbmZSKDeaA/s400/Buckhead-CID+Map_0001.jpg" width="230" border="0" /&gt;&lt;/a&gt;&lt;br /&gt;&lt;div&gt;This image is starting to look familiar. The median at Peachtree and Piedmont is going in, and the elegant traffic signal mast arms are in place. They extend across the travel lanes, eliminating the need for unsightly hanging wires. Phase I has 15 of these, eight of which will have a street light attached to the top.&lt;/div&gt;&lt;div&gt; &lt;/div&gt;&lt;div&gt;Phase I of the Peachtree Boulevard transformation is set for completion this fall.&lt;/div&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-5842379060444459565?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/5842379060444459565'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/5842379060444459565'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/06/rendering-becoming-reality.html' title='Rendering becoming reality'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author><media:thumbnail xmlns:media='http://search.yahoo.com/mrss/' url='http://bp3.blogger.com/_Dp_VnR1LtuQ/RtWs4x5hSOI/AAAAAAAAABc/NgbmZSKDeaA/s72-c/Buckhead-CID+Map_0001.jpg' height='72' width='72'/></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-691077998775430405</id><published>2007-05-25T12:18:00.000-04:00</published><updated>2007-05-31T10:26:39.460-04:00</updated><title type='text'>Boulevard Phase One leveling off</title><content type='html'>Moving through Buckhead, you now see the blacktop of the new beautiful road being completed in both directions from Piedmont north to the MARTA station.  The additional turn lanes at Piedmont will be a great improvement to the intersection.&lt;br /&gt;&lt;br /&gt;The landscaped median now extending south to Piedmont will create better traffic flow and pedestrian crossing.&lt;br /&gt;&lt;br /&gt;The Peachtree Boulevard transformation is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway. Information is available at: &lt;a href="http://www.peachtreeboulevard.com/"&gt;http://www.peachtreeboulevard.com/&lt;/a&gt;.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-691077998775430405?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/691077998775430405'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/691077998775430405'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/05/boulevard-phase-one-leveling-off.html' title='Boulevard Phase One leveling off'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-7571318602090813776</id><published>2007-04-26T11:46:00.000-04:00</published><updated>2007-05-31T10:13:30.686-04:00</updated><title type='text'>Second median now going in</title><content type='html'>Construction of the second median is now underway, starting north of Tower Place.  Final traffic patterns in Phase I of the Peachtree Boulevard transformation are taking place. The landscaped medians will help to establish Peachtree as a true boulevard by improving safety, traffic flow and beauty.  Crews continue to widen Peachtree Road and install new granite curbs and pedestrian-friendly sidewalks.&lt;br /&gt;&lt;br /&gt;The &lt;a href="http://www.peachtreeboulevard.com/"&gt;Peachtree Boulevard transformation &lt;/a&gt;is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway. Information is available at: &lt;a href="http://www.peachtreeboulevard.com/"&gt;http://www.peachtreeboulevard.com/&lt;/a&gt;.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-7571318602090813776?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/7571318602090813776'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/7571318602090813776'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/04/content-for-newsletters.html' title='Second median now going in'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-2028970670862416292</id><published>2007-03-28T09:23:00.001-04:00</published><updated>2007-05-31T10:15:37.189-04:00</updated><title type='text'>Final traffic paterns for Phase I taking shape - median going in</title><content type='html'>Final traffic patterns in Phase I of the Peachtree Boulevard transformation are taking place. The most prominent feature is becoming more visible as the landscaped median installation continues southbound. The median will help to establish Peachtree as a true boulevard by improving safety, traffic flow and beauty.  The last portion of the new stormwater system is being installed, and crews have started paving beginning at GA 400 and moving south toward Piedmont Road.&lt;br /&gt;&lt;br /&gt;The &lt;a href="http://www.peachtreeboulevard.com/"&gt;Peachtree Boulevard transformation &lt;/a&gt;is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway. Information is available at: &lt;a href="http://www.peachtreeboulevard.com/"&gt;http://www.peachtreeboulevard.com/&lt;/a&gt;.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-2028970670862416292?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/2028970670862416292'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/2028970670862416292'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/03/content-for-newsletters.html' title='Final traffic paterns for Phase I taking shape - median going in'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-6526518070155584807</id><published>2007-02-20T10:29:00.000-05:00</published><updated>2007-02-20T10:30:57.440-05:00</updated><title type='text'>David Allman on the Peachtree Boulevard Transformation</title><content type='html'>Find out what &lt;a href="http://media.libsyn.com/media/peachtreeboulevard/david_sot1.mp3"&gt;David Allman &lt;/a&gt;has to say about what's happening in Buckhead.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-6526518070155584807?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/6526518070155584807'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/6526518070155584807'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/02/david-allman-on-peachtree-boulevard.html' title='David Allman on the Peachtree Boulevard Transformation'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-117094967888449322</id><published>2007-02-08T10:45:00.000-05:00</published><updated>2007-02-08T10:47:58.893-05:00</updated><title type='text'>The Mayor speaks out on the Transformation</title><content type='html'>Find out what the &lt;a href="http://media.libsyn.com/media/peachtreeboulevard/mayor_sot1.mp3"&gt;Mayor&lt;/a&gt; has to say about what's happening in Buckhead!&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-117094967888449322?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/117094967888449322'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/117094967888449322'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/02/mayor-speaks-out-on-transformation.html' title='The Mayor speaks out on the Transformation'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-117094901170159760</id><published>2007-02-08T10:34:00.000-05:00</published><updated>2007-02-13T09:56:02.936-05:00</updated><title type='text'>Buckhead benefits from a median</title><content type='html'>The most prominent feature of the Peachtree Boulevard transformation is becoming visible now. Crews are installing the landscaped median which GDOT says will improve safety by 55% and reduce traffic delays by 30%. Find out more from this week's &lt;a href="http://media.libsyn.com/media/peachtreeboulevard/update_6_1.mp3"&gt;progress report&lt;/a&gt;.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-117094901170159760?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/117094901170159760'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/117094901170159760'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/02/buckhead-benefits-from-median.html' title='Buckhead benefits from a median'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-117094664744957408</id><published>2007-02-08T09:56:00.000-05:00</published><updated>2007-05-31T10:16:34.740-04:00</updated><title type='text'>First median going in</title><content type='html'>The most prominent feature of the Peachtree Boulevard transformation is becoming visible now.  Crews are installing the landscaped median starting at the Buckhead MARTA station and moving south toward Piedmont.  The median will help to establish Peachtree as a true boulevard, with improved safety and traffic flow.  GDOT says such medians improve safety by 55% and reduce traffic delays by 30%.  They also make the road more pedestrian friendly.   &lt;br /&gt;&lt;br /&gt;The &lt;a href="http://www.peachtreeboulevard.com/"&gt;Peachtree Boulevard transformation &lt;/a&gt;is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway. Information is available at: &lt;a href="http://www.peachtreeboulevard.com/"&gt;http://www.peachtreeboulevard.com/&lt;/a&gt;.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-117094664744957408?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/117094664744957408'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/117094664744957408'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/02/content-for-newsletters.html' title='First median going in'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-117008737890691947</id><published>2007-01-29T11:12:00.000-05:00</published><updated>2007-05-31T10:17:26.339-04:00</updated><title type='text'>New median to improve traffic flow</title><content type='html'>The Peachtree Boulevard Transformation is becoming much more visible this month.  Crews have started installing the landscaped median at the MARTA bridge moving south past Piedmont.  The median will improve traffic flow, pedestrian safety and the beauty of Peachtree in Buckhead.  Crews are continuing to install granite curbs and the new, wider sidewalks, with trees to create a canopy of shade for pedestrians, making Buckhead a more walkable place.  Stormwater drainage installation and the relocation of utilities are complete.  Real changes are happening in Buckhead and its visitors are already enjoying them.&lt;br /&gt;&lt;br /&gt;The &lt;a href="http://www.peachtreeboulevard.com/"&gt;Peachtree Boulevard transformation &lt;/a&gt;is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway. Information is available at: &lt;a href="http://www.peachtreeboulevard.com/"&gt;http://www.peachtreeboulevard.com/&lt;/a&gt;.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-117008737890691947?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/117008737890691947'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/117008737890691947'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/01/content-for-newsletters.html' title='New median to improve traffic flow'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-116965052384086306</id><published>2007-01-24T09:54:00.000-05:00</published><updated>2007-01-24T09:57:14.993-05:00</updated><title type='text'>Sam Massell on the Peachtree Boulevard Transformation</title><content type='html'>Find out what &lt;a href="http://media.libsyn.com/media/peachtreeboulevard/sam_sot.mp3"&gt;Sam Massell &lt;/a&gt;thinks about the Peachtree Boulevard Transformation!&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-116965052384086306?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116965052384086306'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116965052384086306'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/01/sam-massell-on-peachtree-boulevard.html' title='Sam Massell on the Peachtree Boulevard Transformation'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-116964993111949263</id><published>2007-01-24T09:42:00.000-05:00</published><updated>2007-01-24T09:47:14.126-05:00</updated><title type='text'>Adding a Median!</title><content type='html'>Adding of the median is now underway starting at Georgia 400 and moving south. Find out the latest &lt;a href="http://media.libsyn.com/media/peachtreeboulevard/update_5.mp3"&gt;updates&lt;/a&gt;!&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-116964993111949263?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116964993111949263'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116964993111949263'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/01/adding-median.html' title='Adding a Median!'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-116792905659464453</id><published>2007-01-04T11:43:00.000-05:00</published><updated>2007-01-04T11:45:06.406-05:00</updated><title type='text'>Sally Silver on the Peachtree Boulevard Transformation</title><content type='html'>Find out how &lt;a href="http://media.libsyn.com/media/peachtreeboulevard/sally_sot.mp3"&gt;Sally Silver &lt;/a&gt;feels about the Peachtree Boulevard Transformation.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-116792905659464453?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116792905659464453'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116792905659464453'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/01/sally-silver-on-peachtree-boulevard.html' title='Sally Silver on the Peachtree Boulevard Transformation'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-116792775028894270</id><published>2007-01-04T11:19:00.000-05:00</published><updated>2007-01-04T11:27:04.503-05:00</updated><title type='text'>Peachtree Boulevard Progress Report</title><content type='html'>As Peachtree Boulevard's progress continues, find out the &lt;a href="http://media.libsyn.com/media/peachtreeboulevard/update_4.mp3"&gt;latest improvements&lt;/a&gt;!&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-116792775028894270?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116792775028894270'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116792775028894270'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2007/01/peachtree-boulevard-progress-report.html' title='Peachtree Boulevard Progress Report'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-116498318167241901</id><published>2006-12-01T09:13:00.000-05:00</published><updated>2006-12-01T09:34:09.596-05:00</updated><title type='text'>Content for newsletters</title><content type='html'>-please copy and paste the entry below-&lt;br /&gt;&lt;br /&gt;With the holidays approaching, major construction activities are slowing down but will pick back up on January 8th. During the day, workers will continue to improve the sidewalks and traffic control systems that will make Buckhead safer for pedestrians. The utility relocations have made significant progress and are almost finished. They are expected to be completed around mid-December. At night, work will continue on the storm water system. Once the system is complete, construction will begin on the water vault located in the Tower Place driveway and a new traffic island. In addition to the regularly scheduled officers that direct traffic at intersections, more officers with longer shifts will help with added holiday traffic on Peachtree at the entrance to Lenox Square.&lt;br /&gt;&lt;br /&gt;The &lt;a href="http://www.peachtreeboulevard.com/"&gt;Peachtree Boulevard transformation &lt;/a&gt;is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway.Information is available at the new Web site: &lt;a href="http://www.peachtreeboulevard.com/"&gt;http://www.peachtreeboulevard.com/&lt;/a&gt;.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-116498318167241901?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116498318167241901'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116498318167241901'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/12/content-for-newsletters.html' title='Content for newsletters'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-116299486152716163</id><published>2006-11-08T09:06:00.000-05:00</published><updated>2006-11-08T09:07:41.546-05:00</updated><title type='text'>Allman speaks out on the Peachtree Boulevard Transformation</title><content type='html'>Find out what David Allman thinks about the Peachtree Boulevard Transformation!  &lt;a href="http://media.libsyn.com/media/peachtreeboulevard/david_sot.mp3"&gt;http://media.libsyn.com/media/peachtreeboulevard/david_sot.mp3&lt;/a&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-116299486152716163?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116299486152716163'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116299486152716163'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/11/allman-speaks-out-on-peachtree.html' title='Allman speaks out on the Peachtree Boulevard Transformation'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-116293410671638223</id><published>2006-11-07T16:09:00.000-05:00</published><updated>2006-11-07T16:15:06.726-05:00</updated><title type='text'>Progress Update 3</title><content type='html'>Check out the latest on what's happening with the Peachtree Boulevard Transformation!&lt;a href="http://media.libsyn.com/media/peachtreeboulevard/update_3.mp3"&gt;http://media.libsyn.com/media/peachtreeboulevard/update_3.mp3&lt;/a&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-116293410671638223?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116293410671638223'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116293410671638223'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/11/progress-update-3.html' title='Progress Update 3'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-116180449327337039</id><published>2006-10-25T15:02:00.000-04:00</published><updated>2006-10-25T15:52:49.266-04:00</updated><title type='text'>Content for Newsletters</title><content type='html'>- copy and paste the entry below-&lt;br /&gt;&lt;br /&gt;Peachtree Boulevard is changing everyday. The "move to underground" which started in August is almost done. Several utility poles have already been removed on the south side of Peachtree near Caribou Coffee. More poles will be removed from the north side by late November. Several utility companies like Geogia Power, Bellsouth, ATT, MCI, and many others have been working overtime to make this happen.&lt;br /&gt;&lt;br /&gt;You can find out more about the Transformation of Peachtree Boulevard into a beautiful walkable, livable, and driveable place on their website at &lt;a href="http://www.peachtreeboulevard.com"&gt;www.peachtreeboulevard.com&lt;/a&gt;!&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-116180449327337039?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116180449327337039'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116180449327337039'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/10/content-for-newsletters.html' title='Content for Newsletters'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-116163761472539513</id><published>2006-10-23T17:06:00.000-04:00</published><updated>2006-10-23T17:40:05.913-04:00</updated><title type='text'>Atlanta's Mayor speaks out about the Transformation!</title><content type='html'>Find out what the mayor has to say about the Peachtree Boulevard Transformation: &lt;a href="http://media.libsyn.com/media/peachtreeboulevard/mayor1.mp3"&gt;http://media.libsyn.com/media/peachtreeboulevard/mayor1.mp3&lt;/a&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-116163761472539513?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116163761472539513'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116163761472539513'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/10/atlantas-mayor-speaks-out-about.html' title='Atlanta&apos;s Mayor speaks out about the Transformation!'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-116118571717541973</id><published>2006-10-18T11:34:00.000-04:00</published><updated>2006-10-23T17:41:16.116-04:00</updated><title type='text'>Transformation Progress Update</title><content type='html'>Here's the latest on what's being improved in the Transformation: &lt;a href="http://media.libsyn.com/media/peachtreeboulevard/week2.mp3"&gt;http://media.libsyn.com/media/peachtreeboulevard/week2.mp3&lt;/a&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-116118571717541973?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116118571717541973'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/116118571717541973'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/10/transformation-progress-update.html' title='Transformation Progress Update'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-115444826955948927</id><published>2006-08-01T11:49:00.000-04:00</published><updated>2006-10-23T17:42:09.570-04:00</updated><title type='text'>Content for newsletters</title><content type='html'>&lt;a href="http://photos1.blogger.com/blogger/4597/1069/1600/curb1_reduced.jpg"&gt;&lt;img style="FLOAT: right; MARGIN: 0px 0px 10px 10px; CURSOR: hand" alt="" src="http://photos1.blogger.com/blogger/4597/1069/320/curb1_reduced.jpg" border="0" /&gt;&lt;/a&gt;&lt;br /&gt;- please copy and paste the entry below -&lt;br /&gt;&lt;br /&gt;Enthusiam for curbs. A visible sign of progess in the Peachtree Boulevard transformation... new granite curbs now line portions of Phase I near Terminus. They look very tall now (some are 24 inches high), but once the new asphalt goes in, they will extend just six inches above the surface, providing an attractive edge to the landscaped buffer between the road and sidewalk.&lt;br /&gt;&lt;br /&gt;As you know, the &lt;a href="http://www.peachtreeboulevard.com/"&gt;Peachtree Boulevard transformation &lt;/a&gt;is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway.Information is available at the new Web site: &lt;a href="http://www.peachtreeboulevard.com"&gt;www.peachtreeboulevard.com&lt;/a&gt;.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-115444826955948927?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/115444826955948927'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/115444826955948927'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/08/content-for-newsletters.html' title='Content for newsletters'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-115169258416787577</id><published>2006-06-30T14:30:00.000-04:00</published><updated>2006-06-30T14:36:24.193-04:00</updated><title type='text'>Content for newsletters</title><content type='html'>- please copy and paste the entry below -&lt;br /&gt;&lt;br /&gt;Peachtree in Buckhead is changing so much, you may have missed the news about an exciting recent development.  The Buckhead CID has announced that all utilities in Phase I of the transformation will be buried underground. In total, more than three miles of utilities will vanish, improving the view and making the transformation that much more magnificent.&lt;br /&gt;&lt;br /&gt;The &lt;a href="http://www.peachtreeboulevard.com"&gt;Peachtree Boulevard transformation &lt;/a&gt;is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway.&lt;br /&gt;&lt;br /&gt;Information is available at the new Web site: &lt;a href="http://www.peachtreeboulevard.com"&gt;www.peachtreeboulevard.com&lt;/a&gt;.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-115169258416787577?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/115169258416787577'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/115169258416787577'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/06/content-for-newsletters.html' title='Content for newsletters'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-115137643005328673</id><published>2006-06-26T22:34:00.000-04:00</published><updated>2006-06-26T23:21:12.543-04:00</updated><title type='text'>Creators of the Peachtree Boulevard transformation set sights on Piedmont</title><content type='html'>After establishing the local model for creating a livable, walkable urban neighborhood, the Buckhead Community Improvement District is looking to transform a stretch of Piedmont.&lt;br /&gt;&lt;br /&gt;From this week's Atlanta Business Chronicle:&lt;br /&gt;&lt;blockquote&gt;&lt;p&gt;The Buckhead Community Improvement District is looking at duplicating many of the streetscape improvements planned for Peachtree -- including tree-lined sidewalks and medians, traffic enhancements, bicycle lanes, pedestrian benches and new street lighting -- to a 1.5-mile section of Piedmont running from Powers Ferry and Roswell roads southeast to Pharr Road, a couple of blocks past its intersection with Peachtree. &lt;/p&gt;&lt;p&gt;&lt;a href="http://atlanta.bizjournals.com/atlanta/stories/2006/06/26/story8.html"&gt;Read the full story&lt;/a&gt;.&lt;/p&gt;&lt;/blockquote&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-115137643005328673?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/115137643005328673'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/115137643005328673'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/06/creators-of-peachtree-boulevard.html' title='Creators of the Peachtree Boulevard transformation set sights on Piedmont'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-115074208691561390</id><published>2006-06-19T14:33:00.000-04:00</published><updated>2006-06-19T14:34:46.930-04:00</updated><title type='text'>The Peachtree Boulevard transformation toolkit changing with the season.</title><content type='html'>Go to &lt;a href="http://www.buckheadcid.com/peachtreeboulevard/toolkit.html"&gt;Peachtree Boulevard&lt;/a&gt; to download communications files now featuring our "sidewalks" ad. 11,500 "run-ahead-of-mommy" linear feet of sidewalks. That's what the Peachtree Boulevard transformation will bring to Buckhead.Also, check back here on June 30 for content to paste into your company or neighborhood e-newsletter.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-115074208691561390?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/115074208691561390'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/115074208691561390'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/06/peachtree-boulevard-transformation.html' title='The Peachtree Boulevard transformation toolkit changing with the season.'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-115013702739430565</id><published>2006-06-12T14:30:00.000-04:00</published><updated>2006-06-12T14:30:27.426-04:00</updated><title type='text'>Peachtree Boulevard utilities going down under</title><content type='html'>The future of the Peachtree in Buckhead just got more beautiful. The Buckhead CID announces plans to move all untilities in Phase I of the transformation underground.&lt;br /&gt;&lt;br /&gt;From this week's &lt;a href="http://www.the-stories.com/gbase/Expedite/Content?oid=oid%3A6759"&gt;"The Story"&lt;/a&gt;:&lt;br /&gt;&lt;blockquote&gt;“We now have agreement. We now have a deal. We are going to start boring and going underground for the remaining utilities along the Peachtree corridor project on Monday,” Greene told the group. “We solved a lot of problems and a million-dollar problem became a $200,000 problem. We had some creative thinkers in the field. So the remaining poles from Maple Drive to the MARTA station in our phase one will be Xed out.”&lt;/blockquote&gt;Buckhead CID Executive Director Scotty Greene also announced the launch of the new Peachtree Boulevard Web site. &lt;blockquote&gt;"&lt;a href="http://www.peachtreeboulevard.com"&gt;http://www.peachtreeboulevard.com&lt;/a&gt;is now operational and people can go to that site and&lt;br /&gt;get weekly construction postings, as well as items to place in neighborhood&lt;br /&gt;newsletters... it is kind of like monitoring a police radio."&lt;br /&gt;&lt;/blockquote&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-115013702739430565?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/115013702739430565'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/115013702739430565'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/06/peachtree-boulevard-utilities-going.html' title='Peachtree Boulevard utilities going down under'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-114964574901830093</id><published>2006-06-06T21:57:00.000-04:00</published><updated>2006-06-06T22:05:54.876-04:00</updated><title type='text'>Tree going, more coming</title><content type='html'>Property manager NAI Brannen Goddard reports the large oak tree in front of Lenox Towers (3390 Peachtree Rd) will come down this weekend, the victim of decay. This is not related to the Peachtree Boulevard transformation, which will ultimately include the planing of 186 willow oak trees along the 1.7-mile stretch of the transformation.&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-114964574901830093?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/114964574901830093'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/114964574901830093'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/06/tree-going-more-coming.html' title='Tree going, more coming'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-114910748319704177</id><published>2006-05-31T16:31:00.000-04:00</published><updated>2006-06-26T23:23:06.550-04:00</updated><title type='text'>Creative Loafing: Buckhead Rising</title><content type='html'>This week's &lt;a href="http://atlanta.creativeloafing.com/gyrobase/Content?oid=oid%3A81277"&gt;Creative Loafing cover story&lt;/a&gt; showcases the Peachtree Boulevard transformation.&lt;br /&gt;&lt;br /&gt;&lt;blockquote&gt;&lt;p&gt;"The CID has been quietly working for more than a decade toward the goal of turning Buckhead's main traffic artery into a grand boulevard, complete with trees, benches and that rarest of commodities, at least in Atlanta: a landscaped median strip where its yellow line now lies."&lt;/p&gt;&lt;p&gt;&lt;/p&gt;&lt;/blockquote&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-114910748319704177?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/114910748319704177'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/114910748319704177'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/05/creative-loafing-buckhead-rising.html' title='Creative Loafing: Buckhead Rising'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-114909694662284571</id><published>2006-05-31T13:23:00.000-04:00</published><updated>2006-06-12T14:51:57.656-04:00</updated><title type='text'>Content for newsletters - please copy and paste the entry below</title><content type='html'>----next newsletter update 6/30/06-----&lt;br /&gt;&lt;br /&gt;A newly released &lt;a href="http://buckheadcid.alisias.net/filesharing/peachtreeboulevard.wmv"&gt;video&lt;/a&gt; showcases the transformation happening in Buckhead and salutes the cooperation among public and private interests who are making the transformation possible. The &lt;a href="http://buckheadcid.alisias.net/filesharing/peachtreeboulevard.wmv"&gt;video&lt;/a&gt;, produced by the Buckead CID, debuted at the recent "Kick-off" celebration at the Grand Hyatt in Buckhead attended by more than 500 people including Georgia Govenor Sonny Perdue.&lt;br /&gt;&lt;br /&gt;"I know Buckhead is setting the standard," says Mayor Shirley Franklin, one of four stakeholders who share their praise for the transformation. The others are Buckhead Coalition President and former mayor Sam Massell, Regent Partners developer David Allman and Neighborhood Planning Unit activist Sally Silver.&lt;br /&gt;&lt;br /&gt;Links to the video and other information about the transformation are available at &lt;a href="http://www.peachtreeboulevard.com"&gt;www.peachtreeboulevard.com&lt;/a&gt;.&lt;br /&gt;&lt;br /&gt;-----end of newsletter copy-----&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-114909694662284571?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/114909694662284571'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/114909694662284571'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/05/content-for-newsletters-please-copy.html' title='Content for newsletters - please copy and paste the entry below'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry><entry><id>tag:blogger.com,1999:blog-22934097.post-114902797876647135</id><published>2006-05-30T18:25:00.000-04:00</published><updated>2006-05-30T18:39:55.086-04:00</updated><title type='text'>Peachtree Boulevard</title><content type='html'>&lt;a href="http://photos1.blogger.com/blogger/4597/1069/1600/websticker.jpg"&gt;&lt;img style="FLOAT: right; MARGIN: 0px 0px 10px 10px; CURSOR: hand" alt="" src="http://photos1.blogger.com/blogger/4597/1069/320/websticker.jpg" border="0" /&gt;&lt;/a&gt;&lt;br /&gt;&lt;p&gt;PEACHTREE BOULEVARD TRANSFORMATION&lt;br /&gt;&lt;br /&gt;What is it? The Peachtree Boulevard transformation is the major enhancement of a stretch of Peachtree Road in Buckhead into a more livable, walkable, bikable and drivable promenade. The transformation will allow Peachtree to live up to its reputation as Atlanta’s “signature street.” It will become a destination, not just a throughway.&lt;br /&gt;&lt;br /&gt;Wider sidewalks, a tree-lined median, bike lanes –everything a thriving urban community needs&lt;br /&gt;&lt;br /&gt;Where is it? The transformation covers about 1.5 miles on Peachtree Road through the heart of Buckhead.&lt;br /&gt;&lt;br /&gt;The Peachtree Boulevard transformation will spur an increase in urban living, making Buckhead more desirable, attractive and beautified with:&lt;br /&gt;&lt;br /&gt;11,500 linear feet of new 11-foot wide sidewalks&lt;br /&gt;186 willow oak trees and 50,000 square feet of green space&lt;br /&gt;83 modern benches&lt;br /&gt;188 modern light posts&lt;br /&gt;48 newly painted crosswalks&lt;br /&gt;bike lanes&lt;br /&gt;enhanced transit stops&lt;br /&gt;6-foot-wide tree-lined median with flower plantings&lt;br /&gt;&lt;br /&gt;When will it happen? It’s happening now.&lt;br /&gt;&lt;br /&gt;Who’s doing it? The Buckhead Community Improvement District, Georgia Department of Transportation and the City of Atlanta.&lt;/p&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/22934097-114902797876647135?l=peachtreeboulevard.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/114902797876647135'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/22934097/posts/default/114902797876647135'/><link rel='alternate' type='text/html' href='http://peachtreeboulevard.blogspot.com/2006/05/peachtree-boulevard.html' title='Peachtree Boulevard'/><author><name>ALISIAS</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author></entry></feed>
